Saturday, May 29, 2010

Foundation Walls

West side of the house (front faces South)


Close up of west side


Waterproofing and backfilling around the walls is next.


Back of the old house. The tarp is covering the old basement, 
which will be adjoined to the new basement.



Back of the house.  The patio will be in that space on the right that jogs in.  The opening on the back wall is for the egress window.  You can see the walls and doorways from Alex's old bedroom (two-tone blue) and the kitchen (pink).

No comments:

Post a Comment